Reuse potential
Contents |
Definition
The reuse potential of an assembly is a measure that expresses the likelihood that the parts of that assembly can be disassembled simply, fast and without damage, and thus reused.
Reuse potential can be calculated for a smaller assembly or for a whole building. It relies on aspects such as the compatibility and independence of its parts, and evaluates criteria such as functional and technical autonomy, assembly sequence, connection reversibility and component geometry.
Guidelines
Both reuse potential and transformation capacity are measures of the reversibility of a building. At this moment, the implementation of the concept ‘reuse potential’ is under development. Therefore, the proposed definition will be detailed during the project.
Related terms
The Reuse Potential Tool assesses a component or assembly’s reuse potential. Hence, it supports the design of components and assemblies with a high reuse potential, resulting in an incentive for future reuse.
References
Durmisevic E. (2006). Transformable building structures: design for disassembly as a way to introduce sustainable engineering to building design and construction (doctoral thesis). Delft: TUDelft
--BAMB - Buildings As Material Banks 08:00, 15 Aug 2018 (BST)
Related articles on Designing Buildings Wiki
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.